Estimated Savings Rate Override
This workspace's own rate for one task in the estimated-savings catalog, in place of the shared one.
Catalog Entry ID
The task in the shared catalog this override prices for this workspace. Fixed by the rate you clicked; its name, unit and inherited rate come from the catalog.
Required
Rate
How the manual time grows with the amount of work: a flat number of minutes per unit, a tiered rate with a setup cost for the first unit, or stepped rates by volume.
Required